Project Accomplished by the Company:

 
Reconstruction of Al-Nasser Bridge in Nasseria:

HEESCo. manufactured 18 steel boxes for the reconstruction of Al-Nasser Bridge in Nasseria, total length 180 meter, total weight 244Ton including all steel sections needed for construction. These boxes were fabricated using special type of carbon steel according to international standards. The work started in Oct. 15th 2001, and was finished in Jan. 10th 2002. In this work complex technological processes were used in welding, preparing and fabrication in order to get the good quality with accurate dimensions.

Fabrication of steel structure for Boilers of Hartha power station:

The company signed a contract with Technoprom, a Russian company to manufacture steel structure for unit 2, 3 in Hartha power station in Basrah, with all services tanks. Total weight was 3456 Ton. Total cost was 2.250 million dollar. All specifications for fabrication and transportation were according to Russian standard (GHOST) under strict supervision by Russian specialists in testing and engineering inspection. Automatic welding machines were used to weld plates of 8-43 m.m. thickness. One of the main processes were the use of MIG (Metal Inert Gas Welding) with full X-ray and Ultrasonic test. 50 welders were working in this job and 36.5 ton of welding consumables were used. The products were finished and shipped to the site accurately damages and within tolerances and without any damages.

 

 

Small Oil Refineries 10000B/Day:
HEESCo. fabricated five units of oil refineries with capacity 10000 B/Day for each. 282 equipment was manufactured from, carbon steel, stainless steel & alloy steel, with different complexity. Most of these equipments have internal and external parts working in severe environment pressure 140 Bar, temperature up to 350? C. These equipment was 5 crude oil furnace, 10 separating towers with 14-25 meter height, 40 Heat-exchanger, 15 steam boilers. Total weight of these equipments were 1400Ton. This work was started in March 1st 2000.

Rehabilitation of Heat-exchangers for North Gas Company:
Many contracts Many contracts was executed for North Gas Company to rehabilitate of different sizes and capacities of heat exchangers Materials of construction were C.S., low alloy steels and non-ferrous.

 

 

Project Accomplished by the Company:

 
Reconstruction of Al-Nasser Bridge in Nasseria:

HEESCo. manufactured 18 steel boxes for the reconstruction of Al-Nasser Bridge in Nasseria, total length 180 meter, total weight 244Ton including all steel sections needed for construction. These boxes were fabricated using special type of carbon steel according to international standards. The work started in Oct. 15th 2001, and was finished in Jan. 10th 2002. In this work complex technological processes were used in welding, preparing and fabrication in order to get the good quality with accurate dimensions.